Post: I'm not normally one to critisise...but
I'm not normally one to critisise...but →
Posted Tuesday 23rd September 2008 15:29 GMT
In Why blade servers still don't cut it, and how they might
One socket to rule them all - I see this happening very shortly after world-peace. Just because it makes sense (does it really?) doesn't mean it gives the chip-makers any advantage at all and without advantage they won't do it.
Modular motherboards - most people buy blades because they're cheap, one of the cheapest parts of a blade is its motherboard. Introducing the required connectors/interfaces between the various parts of a modular motherboard would inevitably make them more expensive, more prone to failure and make it even harder to configure and buy.
Blade and sub-blade standards - you want standards AND innovation? I'm not saying it can't be done but again what is in it for the manufacturers who are making a fortune on their custom NIC/HBA/etc cards?
No more AC power inside the data center - changing out 32A AC commando PSU lines in an existing data centre for DC ones makes little sense as the majority of other devices will still need AC so you end up leaving those running in each rack too - doubling cabling you rely on, plus the power switching circuitry itself. If it was a greenfield data centre and everything you wanted to put inside was DC then fine, good idea - but that rarely happens. Plus, in my experience, M&E work is the slowest part of any change, so you end up with a very long time to change in your deliver plan.
Integrated refrigerant cooling for key components - so you suggest that datacentres have normal AC for most things and direct coolants for hotter things - I worry enough about single cooling systems, never mind two of the things. Isn't it cheaper, more resilient, quieter, and just more '2008', to draw in ambient air and expel at force the exhaust air, just like Switch in Vegas do (http://www.theregister.co.uk/2008/05/24/switch_switchnap_rob_roy/)?
Most read
Popular Whitepapers
- A Smart Path to Virtualization
Virtualization and Flexible Computing - Real-world server consolidation with Hyper-V
35 HP ProLiant DL385 servers onto 5 Dell PowerEdge M610 blade servers running Hyper-V - Business-Critical Applications
The Benefits of Intel Xeon Processors and Windows Server 2008 R2 for Business-Critical Apps - Virtualize at the speed of your business
The Dell guide to virtualization - A Cure for Server Sprawl
Dell Global Infrastucture Consulting helps DeKalb Medical - Staying committed to server refresh reduces cost
Can a server refresh help your company?