How it's going to work
Each tunnel is going to be separately wired. The tunnel heading toward France will be run by UK networks - the agreement is not yet signed. The tunnel toward UK will be run by the French networks.
Presumably it was thought the "handoff" was best done going out of the tunnel rather than going in.
(Source Railway Gazette)